Thursday, October 26th | Morning Class | 9:00 am - 12:00 pm
Piping design for the condensing and non-condensing boiler. We will examine the components required and the best application, the direct connected, and primary/secondary installation.
Air, dirt & magnetic separation.
Hydraulic separators to control pump conflict in primary/secondary installations.
Desiging for air removal & system filling.
Zoning with zone valves vs. pumps.
System balancing for optimum performance.
Additional Information:
Class starts at 9:00 am and runs through noon.
Continental Breakfast -Coffee – Bagels – Danish
Ken Resnick - Director of Training
Ken Resnick is considered one of the industry leading educators and will make the most difficult subjects not only simple to understand but enjoyable to learn. Ken has over 40 years as a Master Plumber, Master Electrician, and holds a NYS certificate for teaching. Ken is NATE, CSME, NORA & BPI certified and is considered an industry expert in troubleshooting equipment and systems.